150kW Solar Install at CSIRO

Customer Background
CSIRO, a pioneer in scientific research and innovation, collaborated with Select Electrical for a substantial renewable energy project. The installation of a 150kW solar system, consisting of 454 x 330w panels, reflects CSIRO’s commitment to sustainability and clean energy solutions.
Installation Overview

Solar Panel: 454 x 330w Panels

Installation Experience
Select Electrical worked closely with CSIRO at their North Science Road location. The project involved early mornings and late nights to adhere to a challenging timeline. The dedicated team completed the installation in just six days, showcasing their commitment to delivering exceptional results under tight schedules.
Customer Satisfaction
CSIRO’s experience with Select Electrical underlines their expertise and dedication. The efficient and timely completion of the project demonstrated Select Electrical’s capability to handle complex installations while adhering to demanding schedules.
System Performance
The installed 150kW solar system significantly contributes to CSIRO's energy needs while aligning with their sustainability goals. The integration of 454 x 330w panels ensures optimum energy production, reducing reliance on traditional energy sources.
Connection and Completion
The successful connection of the solar system was accomplished in collaboration with Evoenergy, ensuring seamless integration with the local energy grid.

Conclusion

The 150kW solar installation at CSIRO’s (Commonwealth Scientific and Industrial Research Organisation) North Science Road facility represents a significant step towards sustainability for a high-energy-consuming research organisation. The project was designed to reduce reliance on conventional energy sources while supporting CSIRO’s environmental initiatives. The system’s installation required careful planning to ensure maximum solar efficiency, incorporating advanced panels capable of delivering consistent energy output. This large-scale system not only contributes to CSIRO’s operational savings but also acts as a model for similar institutions looking to transition to renewable energy. By reducing carbon emissions and operational costs, the solar installation highlights how large research facilities can integrate green energy into their daily operations. Select Electrical ensured minimal disruption to CSIRO’s operations during installation, coordinating closely with the facility to maintain efficiency and safety. The success of this project underscores the potential for widespread solar adoption in government and scientific organisations. CSIRO’s commitment to renewable energy sets a benchmark for institutions aiming to reduce their carbon footprint while maintaining energy security. This project demonstrates the scalability of solar energy solutions and reinforces the role of commercial solar in Australia’s transition to cleaner, more sustainable energy sources.